Decision on 2023 modifications to the Regulatory Financial Performance Reporting (RFPR) for RIIO-2
We are publishing the modified versions of the RFPR template and RIGs. Source
Data Communications Company (DCC): Regulatory Instructions and Guidance 2023
The Regulatory Instructions and Guidance (RIGs) define the manner in which DCC should report key price control and quality of service information in its annual price control submission. Source
Statutory consultation on a proposal to modify the Special Conditions of the Electricity Transmission licence held by National Grid Electricity System Operator Limited – July 2023
The Gas and Electricity Markets Authority proposes to modify the special conditions of the electricity transmission licence held by National Grid Electricity System Operator Limited. Source
Notice of proposed modifications to the ESO Regulatory Instructions and Guidance, Regulatory Reporting Pack, and Price Control Financial Model Guidance for RIIO-2
Notice of proposed modifications to the ESO Regulatory Instructions and Guidance. Source
Price cap – Consultation on technical changes to the price cap methodology – June 2023
We are consulting on technical changes to how we process modelling inputs used in the calculation of the price cap. Source
Consultation on proposals to modify arrangements for the Over-Recovery of Allowed Revenue, Housekeeping changes to the Licence and the Baseline Margin Indexation change
Consultation on proposals to modify arrangements for the Over-Recovery of Allowed Revenue. Source
Dare Global Limited – Notice of grant for gas shipper licence
Notice of grant of gas shipper licence for Dare Global Limited. Source
Conrad (Eye) Limited – Notice of grant of an Electricity Generation licence
Notice of grant of electricity generation licence for Conrad (Eye) Limited. Source
Conrad (Walpole) Limited – Notice of grant of an Electricity Generation licence
Notice of grant of electricity generation licence for Conrad (Walpole) Limited. Source
Modification to Centrica Storage Limited’s exemption to nTPA for Rough gas storage facility
This letter sets out our decision to extend the exemption and includes the revised Exemption Order. Source